Overhaul of a residential building. Law on Overhaul of Residential Apartment Buildings. When do CRCs begin

A house is considered multi-apartment if it consists of two or more apartments that have independent access to land plot adjacent to the house, or in a common area in it. Such a house contains elements of common property with other homeowners, which is established by the Urban Planning Code. According to the methodological recommendations, in an apartment building, unlike an individual one, real estate includes two parts:

  1. Premises that are intended for residential and non-residential purposes, while they may be the property of citizens registered in the territory of the Russian Federation.
  2. Common property that is divided into ownership shares between owners.

What is the essence of the work?

The overhaul program is a whole set of documentation on the basis of which all technical measures should be carried out. The existing system of repairs presupposes that repair and structural transformations must be carried out at clearly defined intervals, which are clearly regulated and strictly implemented. All other terms and volumes of work are agreed upon by a legal act.

Overhaul of residential buildings in Moscow, like any other city in our country, involves the replacement or restoration separate parts, structures, utilities and equipment due to the fact that they are physically worn out or destroyed. In addition, within the framework of the same work, the consequences of obsolescence of certain structures are eliminated, internal improvement is carried out, that is, the modernization of the building.

Overhaul types

The overhaul of buildings and structures can be complex and selective - it depends on the technical condition of the buildings to be renovated, on the features of their planning solutions, as well as the degree of internal improvement. In complex works, structural elements and engineering equipment are replaced with more modernized elements. Moreover, repairs can be carried out on the entire building as a whole or its individual sections. In case of complex repairs, it is assumed that the work is carried out, which are established by the law on overhaul FZ-185, art. 15. Materials should be used those that will ensure the standard service life of the structures and systems being repaired. After the work carried out, the apartment building must meet all the operating requirements that apply to it.

With selective repairs, complete or partial replacement of individual structural elements of the house, equipment is made in order to fully compensate for their physical and functional wear. For selective repairs, it is important to take into account the technical condition of individual structures and building elements.

Who is responsible?

The decision to carry out repairs is most often made at a general meeting of homeowners. At the same time, there are a number of rules that must be taken into account:

  1. Only common property in an apartment building is subject to repair work.
  2. Of the common property, only those structural elements and communication systems are repaired, which are described in part 3 of article 15 of the Federal Law No. 185.
  3. Capital must be performed to the extent established by federal law.

All these conditions are created in order to solve several problems at once. First, it is important to improve the energy efficiency of apartment buildings. Secondly, it is necessary to create favorable conditions for the existence of citizens. Thirdly, the use of modern materials and new technologies ensures the modernization of each building. At the same time, modernization refers to the measures necessary to update outdated planning solutions, engineering equipment, so that the building ultimately meets the existing requirements.

What is included in the common property?

In order to fully understand what the overhaul of an object consists in, it is important to understand what property is considered common. According to the rules, the composition of the property is determined by the homeowners themselves, who also fulfill the responsibilities for the maintenance of their premises. Control over the maintenance of common property is taken over by the authorities state authorities, and local governments prepare and conduct at the option of the management company. In this case, those parts of the house that perform an auxiliary function are considered common property. Common areas in the house are:

  • staircases;
  • elevators;
  • stairs and shafts;
  • corridors;
  • various cellars (technical, wheelchair).

That is, everything that is not part of the apartment and is not intended for individual use, according to the rules, is considered common. Thus, the program for the overhaul of apartment buildings must necessarily be drawn up taking into account these parameters.

What is included in the overhaul?

So, we have decided that each apartment building has a common and individual property. According to this, a plan for the implementation of repair work is drawn up. So, overhaul of residential buildings in Moscow suggests that the following services should be performed as part of capital measures:

  1. Intra-building engineering systems were repaired (i.e. heat, gas, water and electricity supply).
  2. Elevator equipment must be repaired or replaced if found to be unserviceable.
  3. The roof is being renovated, as well as the basements, which are considered common property.
  4. Renovation work is being carried out on the façade and foundations.

According to regulatory legal acts, all these works are financed by the capital repair fund, which is formed on the basis of contributions, the minimum amount of which is also established by law. In addition, the funds of this fund can additionally be used for facade insulation, installation of a ventilated roof and device exits to it, installation of metering devices - common to the whole house, installation of various heating units. If the owners decide to increase their contributions above the minimum amount, then these funds can also be used to repair common property in the house. In addition, a certain amount of funding can also come from state support, which is provided by a specific constituent entity of the Russian Federation. It is on the basis of such assistance that, as a rule, regional repair works are carried out in many cities of our country.

Regulations: What to Remember?

According to the legislation, overhaul must be carried out in a timely manner - this is clearly regulated by regulatory legal acts. Thus, the law on major repairs establishes a minimum contribution for the repair of common property in a house. Again, according to the legislation, a system for carrying out work to check the technical condition of apartment buildings is determined. In accordance with legal acts, a regional operator is selected, the composition of its property is determined, constituent documents are created that will establish its activities.

The regulations also spell out in what order and under what conditions the state provides its services in order to carry out major repairs of residential buildings in Moscow. It is the state, if necessary, that should issue loans, loans and other funds for the implementation of the overhaul program. At the state level, the process of creating regional programs is also controlled.

Features of regional policy

In the regions, the overhaul program has its own characteristics:

  1. The terms of the overhaul of an apartment building are determined, which may differ from the generally accepted ones.
  2. The program is approved by the executive authority of each constituent entity of the Russian Federation.
  3. It also provides for the possible provision of financial support at the state level.

The regional program consists of several components. Firstly, this includes all apartment buildings that must be renovated in accordance with the decree. Emergency buildings and buildings subject to demolition are excluded from this list. Secondly, houses are excluded from the program, the structural elements of which (that is, the roof, walls or foundation) have a degree of physical wear and tear over 70%. Thirdly, regional capital repairs do not cover houses, the repair of which will cost more than the construction of one square meter of housing. After the regional program for the overhaul of apartment buildings has been created, the terms and procedure for carrying out the work, and the sources of their financing, must be determined within six months. The normative acts of the Russian Federation also indicate that houses consisting of three or fewer apartments may not be included in the regional program. The peculiarity of the program is that after its adoption and approval, it is impossible to make any changes to it.

Overhaul of residential buildings in Moscow and any other constituent entity of the Russian Federation is carried out in the order specified in the regional program. At the same time, first, repairs are carried out in those houses that will be privatized in the first place. According to the legislation, any regional program must be updated every year.

What are the contributions made of?

The owners must pay monthly fees, on the basis of which repair and technical work will subsequently be carried out. The minimum amount is established by the City Planning Code, but the amount can be higher if the homeowners want it. If or will be demolished, then the owners do not have to pay any funds. According to the code, tenants are required to pay capital repair contributions within eight months. The Moscow region, for example, reduced this period to three calendar months. It is at the expense of interest from these contributions that the capital repair fund is formed. Homeowners can themselves choose how they will form this fund:

  1. Transfer contributions for overhaul to a special account.
  2. Transfer funds to the account of the selected operator.

In the first case, the owners need to decide on the amount of the monthly contribution (it cannot be lower than the minimum established by the regulatory legal act), the list of overhaul works, set the timing of the overhaul of the apartment building, appoint the account holder and choose the credit organization that will open it. In the second case, the owners will simply choose a regional operator, who will deal with all of the above issues. Homeowners are given a period of six months, during which they must decide on the method of forming the fund. Moreover, the way the fund is formed can be changed at any time - again common decision owners of premises. In general, all decisions related to or determining the amount of contributions are made at the general meeting.

Where can you spend money from the fund?

As the law says, major repairs of apartment buildings are carried out at the expense of the fund. That is, any construction work and the development of project documentation can be paid from these funds. In addition, money from the fund can be used for other purposes, for example, if you need to pay for construction supervision services, repay loans that were taken for repairs, pay the costs of obtaining guarantees and sureties, if you need to take a loan for overhaul. If suddenly the building is recognized as emergency or subject to demolition, then all the funds contributed to the fund are divided between the owners of the premises in the house.

What's in Moscow?

As already mentioned, each constituent entity of the Russian Federation adopts a regional program, on the basis of which repair and technical measures are carried out. In Moscow, such a program is planned for 2014-2016. Over the years, it is planned to carry out a number of works:

  1. Renovation of common property and a number of structural elements. In 2013, as part of this work, 390 apartment buildings were repaired.
  2. Carry out buildings that are located in the central part of Moscow.
  3. Perform a number of works on replacement of elevator equipment in apartment buildings

In the capital, over the past few years, a model has been developed, on the basis of which the state co-finances the repair work carried out by the owners. That is, the city allocates subsidies to homeowners, and they pay the missing amount from their own funds. At the same time, about 95% of the funds are allocated from the city budget for these purposes, while about 5% of the residential premises were renovated at the expense of the residents themselves.

Overhaul program of the Moscow region

A more extensive program covering 2014-2038 has been developed in the Moscow region. During this time, the authorities are planning to solve many problems in stages. At the same time, the program takes into account the use of modern and energy efficient materials and technologies. The program is focused on creating a safe and favorable living environment for residents. Repair and technical measures in the Moscow region will be carried out in stages.

Years of repair *

Number of renovated housing (in%)

* numbers will be updated as the program is being implemented

All houses renovated during the program will receive an energy efficiency class. The assignment of the class will be carried out under the supervision of the State Housing Inspectorate of the Moscow Region. At the same time, not emergency and not subject to demolition houses will be subject to major repairs, but the list is approved in the program of each specific constituent entity of the Russian Federation.

Thus, the organization of major repairs is a set of works aimed at making housing more convenient and favorable, while improving the operational characteristics of each building.

The tenants of our five-story building accidentally heard in the district council that this spring we will begin major repairs. But we could not find out the details.

Julia Pavlicheva. Northwestern District.

As told in the Department of Overhaul of the Housing Fund of Moscow, in the capital there is a list of standard work performed in residential buildings during a comprehensive overhaul. At the same time, the types of work and their volumes are determined individually for each high-rise building on the basis of a technical conclusion on the state of its structures and engineering systems.

We publish the main types of work (according to the appendix to the order of the Moscow government No. 524-RP of 03/30/2009).

TAKE A NOTE

1. Walls, facades

Insulation and repair of facades, plinths;

replacement of window and balcony fillings with energy-efficient noise-insulating ones;

glazing of balconies and loggias;

repair of balconies and loggias with restoration of waterproofing, tiled coverings, replacement or repair of fences;

installation of canopies over balconies and loggias of the upper floors, entrances to porches and basements;

repair of fire escapes, blind areas, exterior walls of elevator shafts;

replacement and repair of an external drain.

2. Foundations, basements

Repair of foundations, pits, basement entrances;

sealing of the intersection of engineering communications with the foundations of the building.

3. Roofs and attics

Repair or replacement (roofing, rafter systems, trusses, etc.), fire protection of wooden structures;

restoration of temperature and humidity conditions;

replacement or repair of internal drainage elements;

replacement or repair of parapet grids, fences, grounding and lightning protection devices.

4. Ladders

Repair of steps;

replacement or repair of fences, screening screens for flights of stairs and landings.

5. Doors, entrance areas

Repair or replacement of entrance doors to entrances (with the installation of door closers, stops), vestibule doors, apartment vestibules, staircases;

repair, partial replacement and (or) strengthening of the entrance area, as well as the steps of the stairs in front of the entrance (if any);

replacement, repair or implementation of fences (if there is a staircase in front of the entrance);

replacement, repair or implementation of lighting.

6. Central heating

Repair, replacement of pipelines, risers and connections to heating devices;

installation of heating devices with built-in or attached automatic thermostats;

installation of shut-off valves;

reconstruction of the panel heating system.

7. Ventilation

Cleaning the ventilation system;

replacement of ventilation grilles.

8. Cold and hot water supply

Repair, replacement of pipelines, heated towel rails related to general building engineering systems;

replacement of piping and installation of valves;

installation of individual metering devices for cold and hot water;

the device of a household fire hydrant with a hose on the pipeline cold water in apartments;

replacement of plumbing fixtures in apartments owned by Moscow.

9. Sewerage and drainage

Repair or replacement of pipelines, replacement of sewerage beds for plumbing fixtures;

repair or reconstruction of an internal drain.

10. Electrical equipment

Repair (replacement) of input-distribution devices, house, entrance and floor switchboards;

installation of protective shutdown devices for each apartment, replacement of lighting in common areas;

installation of photo switches, time relays and other devices for automatic or remote control of lighting in public places, emergency lighting of stairwells, entrances to porches, etc.;

replacement of lamps with vandal-proof lamps with energy-saving lamps.

11. Garbage chutes

Repair and replacement of garbage chute elements;

installation of a system for flushing, cleaning and disinfection of the chute barrel.

12. Fire protection systems

Replacement of fire cabinets in stairwells with the installation of fire hoses and taps in high-rise buildings;

installation of autonomous smoke detectors in the corridors of apartments.

13. Household gas supply

Reconstruction of the internal gas supply system;

removal of gas pipelines from basements and entrances;

replacement of the facade gas pipeline during the insulation of the outer walls;

replacement of indoor gas equipment.

14. Interior decoration

Refurbishment of residential premises and common areas of apartments in the area of ​​replacement of engineering systems and plumbing fixtures in the event of a violation of the finishing of the premises when laying pipelines and replacing plumbing fixtures;

repair of premises of common shared ownership, including staircases, elevator and apartment halls, etc.

15. Elevators and other works

Replacement, overhaul or modernization of elevators;

ensuring accessibility for people with disabilities (points 4, 5 and 15);

complex landscaping of the yard (if necessary).

ATTENTION!

With complaints and questions about the overhaul, you can contact the "hot lines" (on weekdays from 10.00 to 17.00) in the offices of the Department of capital repairs of the housing stock of Moscow and the prefectures of the districts.

Repair work, as a rule, depending on the frequency of carrying out, is divided into two types: maintenance and overhaul.

List of overhaul works

Lists of types of overhaul works are contained in departmental acts (Regulations, Norms and Rules .., Instructions, Recommendations, etc.). These lists of types of work vary depending on the type of capital construction object, its purpose.

The types of work are given in the annexes to the departmental regulations, the texts of which are given in the attachment to this publication:

Appendix 8. List of works on capital repairs of buildings and structures ( Resolution of the USSR State Construction Committee of 12/29/1973 N 279 "On the approval of the Regulations on the scheduled preventive maintenance of industrial buildings and structures" (together with "MDS 13-14.2000 ..."))

Appendix N 8. Indicative list work performed during the overhaul of the housing stock ( Resolution of the State Construction Committee of the Russian Federation of September 27, 2003 N 170 "On approval of the Rules and norms for the technical operation of the housing stock")

Appendix 9. List of works on capital repairs of buildings and structures ( Order of the Ministry of Justice of Russia of 28.09.2001 N 276 (as amended on 24.01.2006) "On approval of instructions for the technical operation of buildings and structures of institutions of the penal system")

Table 2.3. The list of work on the overhaul of apartment buildings to be included in the scope of work financed from the funds provided for by Federal Law N 185-FZ ( )

Definition of the concept of "overhaul" in the normative legal act

Overhaul- repairs carried out to restore technical and economic characteristics object to values ​​close to the design, with the replacement or restoration of any component parts ( Order of the State Construction Committee of the Russian Federation of 13.12.2000 N 285 "On Approval of the Standard Instruction for the Technical Operation of Heating Networks of Municipal Heat Supply Systems").

Overhaul- carrying out a complex of construction works and organizationally - technical activities to eliminate physical and moral deterioration, not associated with a change in the main technical and economic indicators of the building and functional purpose, providing for the restoration of its resource with partial replacement, if necessary, of structural elements and systems of engineering equipment, as well as improving performance ( Decree of the Government of Moscow of July 30, 2002 N 586-PP (as amended on December 23, 2015) "On approval of the Regulations on a unified procedure for pre-design and design preparation of the construction of engineering communications, structures and road transport facilities in the city of Moscow").

Overhaul of capital construction objects(except for linear objects) - replacement and (or) restoration of building structures of capital construction objects or elements of such structures, with the exception of load-bearing building structures, replacement and (or) restoration of engineering and technical support systems and networks of engineering and technical support of capital construction facilities, or their elements, as well as the replacement of individual elements of load-bearing building structures with similar or other elements that improve the performance of such structures and (or) the restoration of these elements ( (as amended on 06/18/2017)

Overhaul of buildings and structures

Overhaul of buildings and structures includes work on the restoration or replacement of individual parts of buildings (structures) or entire structures, parts and engineering equipment due to their physical wear and tear and destruction for more durable and economical ones that improve their performance ( Resolution of the Gosstroy of Russia dated 05.03.2004 N 15/1 (as amended on 16.06.2014) "On approval and implementation of the Methodology for determining the cost of construction products on the territory of the Russian Federation" (together with "MDS 81-35.2004 ...")).

Overhaul of the building- a complex of construction and organizational and technical measures to eliminate physical and functional (moral) wear and tear, which do not involve changes in the main technical and economic indicators of a building or structure, including, if necessary, the replacement of individual or all structural elements (except for non-replaceable ones) and engineering systems equipment with their modernization. Overhaul does not extend the service life of buildings, since it is determined by the most durable elements that cannot be replaced during repair ( "Methodological recommendations on the formation of the scope of work on the overhaul of apartment buildings financed from the funds provided for by the Federal Law of July 21, 2007 N 185-FZ" On the Fund for Assistance to Reforming Housing and Communal Services "(approved by the State Corporation" Fund for Assistance to Reforming Housing and Communal Services " 02/15/2013)

Overhaul of an apartment building

Overhaul of an apartment building- carrying out and (or) providing the works and (or) services provided for by this Federal Law for eliminating faults of worn out structural elements of the common property of owners of premises in an apartment building (hereinafter referred to as common property in an apartment building), including for their restoration or replacement, in in order to improve the operational characteristics of common property in an apartment building ( Article 2 of the Federal Law of 21.07.2007 N 185-FZ (as amended on 23.06.2016) "On the Fund for Assistance to the Reform of the Housing and Communal Services").

Overhaul of the common property of an apartment building: a set of works (services) for the replacement and (or) restoration (repair) of the bearing and (or) functional capacity of structures, parts, engineering and technical support systems, individual elements of the bearing structures of an apartment building that have lost during operation, to similar or other improving indicators up to their standard state, when the volume of such work exceeds the current repair ( )

Overhaul types

Complex and selective overhaul

Overhaul is subdivided into complex overhaul and selective overhaul.
a) is a repair with the replacement of structural elements and engineering equipment and their modernization. It includes work covering the entire building as a whole or its individual sections, which compensates for their physical and functional wear and tear.
b) is a repair with full or partial replacement of individual structural elements of buildings and structures or equipment, aimed at full reimbursement of their physical and partially functional wear and tear.
Attribution to the type of overhaul depends on the technical condition of the buildings scheduled for repair, as well as the quality of their layout and the degree of internal improvement ( "Methodological recommendations on the formation of the scope of work on the overhaul of apartment buildings financed from the funds provided for by the Federal Law of July 21, 2007 N 185-FZ" On the Fund for Assistance to Reforming Housing and Communal Services "(approved by the State Corporation" Fund for Assistance to Reforming Housing and Communal Services " 02/15/2013))

Complex overhaul: replacement, restoration and (or) repair of the common property of an apartment building or its individual parts, made in relation to most of the common property of an apartment building ( "GOST R 51929-2014. National standard of the Russian Federation. Services of housing and communal services and management of apartment buildings. Terms and definitions" (approved and put into effect by the Order of Rosstandart of 11.06.2014 N 543-st)

Complex overhaul- covers all elements of the building, provides for the simultaneous restoration of all worn out structural elements, engineering equipment and an increase in the degree of improvement of the building as a whole, eliminates physical and moral deterioration. Carrying out the next comprehensive overhaul of a building or structure is inappropriate if it is planned to demolish or relocate buildings or structures in connection with the upcoming construction of another building or structure on the site they occupy, reconstruction of the building is supposed, or the dismantling of the building due to general dilapidation is planned. In these cases, work should be carried out to maintain the structures of the building or structure in a condition that ensures their normal operation during the appropriate period (before demolition or reconstruction) ( )

Selective overhaul: replacement (restoration) of the common property of an apartment building or its individual parts, carried out in relation to a smaller part (some parts) of the common property of an apartment building ( "GOST R 51929-2014. National standard of the Russian Federation. Services of housing and communal services and management of apartment buildings. Terms and definitions" (approved and put into effect by the Order of Rosstandart of 11.06.2014 N 543-st)

Selective overhaul- covers individual structural elements of a building or its engineering equipment, while eliminating physical wear and tear of individual elements and technical systems of the building. Selective overhaul is carried out in cases where a comprehensive overhaul of a building can cause serious interference in the operation of the facility, with significant wear of individual structures that threatens the safety of the remaining parts of the building, when it is economically inexpedient to carry out a comprehensive overhaul according to the restrictions given in the definition of a comprehensive overhaul ( Resolution of the Moscow Government dated 09.29.2010 N 849-PP (as amended on 07.07.2015) "On approval of the Regulations for the overhaul of real estate objects owned by the city of Moscow and transferred to trust management")

Emergency overhaul- repair or replacement of all structural elements, devices, systems of engineering equipment that have failed due to accidents, natural disasters, terrorist acts and vandalism ( Resolution of the Moscow Government dated 09.29.2010 N 849-PP (as amended on 07.07.2015) "On approval of the Regulations for the overhaul of real estate objects owned by the city of Moscow and transferred to trust management")

Overhaul of external engineering communications

For overhaul of external engineering communications and improvement facilities include work on the repair of water supply networks, sewerage, heat and gas supply and power supply, landscaping of courtyards, repair of paths, driveways and sidewalks, etc. ( Resolution of the Gosstroy of Russia dated 05.03.2004 N 15/1 (as amended on 16.06.2014) "On approval and implementation of the Methodology for determining the cost of construction products in the Russian Federation" (together with "MDS 81-35.2004 ...")

Overhaul of roads

Overhaul of the road- a set of works on the replacement and (or) restoration of structural elements of the highway, road structures and (or) their parts, the implementation of which is carried out within the established permissible values ​​and technical characteristics the class and category of the motor road and, when implemented, the structural and other characteristics of the reliability and safety of the motor road are affected and the boundaries of the right-of-way of the motor road do not change ( Art. 3 of the Federal Law of 08.11.2007 N 257-FZ (as amended on 07.02.2017) "On highways and road activities in the Russian Federation and on amendments to certain legislative acts of the Russian Federation")

Overhaul of the road surface- a complex of works in which a complete restoration and increase in the performance of road pavements and pavements, road beds and road structures is carried out, worn structures and parts are replaced or replaced with the most durable and durable ones, the geometric parameters of the road are increased taking into account the growth of traffic intensity and axial loads cars within the limits corresponding to the category established for the road being repaired, without increasing the width of the roadbed along the main length of the road ( Order of the Ministry of Housing and Communal Services of the Moscow Region of June 29, 2015 N 125-RV "On Approval of the Rules for the Improvement of the Territory of the Balashikha Urban District of the Moscow Region")

The term of the overhaul. Reasonable time

The timing of the overhaul is either established by the parties, or established by regulatory legal acts (NLA). If there is no indication of the timing of the repair in the contract or regulation, then it is carried out within a reasonable time.

The concept of a "reasonable time" is traditional for civil law and is mentioned repeatedly in the provisions of the Civil Code of the Russian Federation (see Art. 314 of the Civil Code of the Russian Federation, in relation to pledge relations - clause 4 of Art. 345, clause 1 of Art. 358 of the Civil Code of the Russian Federation).

A reasonable time frame for major repairs depends on the condition of the property, its properties, climate characteristics, features of major repairs, technical capabilities and other reasons.

In addition, the regulatory legal act may provide for both specific terms for the repair, and the procedure for determining them can be fixed, the frequency of certain types of repair work can be established.

Attachments:

; Appendix 8 to the Decree of the USSR State Construction Committee of 12/29/1973 N 279 "On Approval of the Regulations on the Preventive Maintenance of Industrial Buildings and Structures" (together with "MDS 13-14.2000 ...")

Appendix 8

SCROLL
WORKS ON CAPITAL REPAIRS OF BUILDINGS AND STRUCTURES

A. BUILDINGS

I. Foundations

1. Changing wooden chairs or replacing them with stone or concrete pillars.
2. Partial re-laying (up to 10%), as well as reinforcement of stone foundations and basement walls, not associated with the building superstructure or additional loads from newly installed equipment.
3. Restoration of vertical and horizontal insulation of foundations.
4. Restoration of the existing blind area around the building (more than 20% of the total area of ​​the blind area).
5. Renovation of existing drains around the building.
6. Change of single collapsing stone and concrete pillars.

II. Walls and columns

1. Sealing cracks in brick or stone walls with clearing furrows, with bandaging seams with old masonry.
2. Installation and repair of structures that strengthen stone walls.
3. Re-laying of dilapidated brick cornices, lintels of pit parapets and protruding parts of the walls.
4. Re-laying and repair of individual dilapidated sections of stone walls up to 20% of the total volume of masonry, not associated with the superstructure of the building or additional loads from newly installed equipment.
5. Reinforcement of reinforced concrete and stone columns with clips.
6. Repair and partial replacement (up to 20% of the total volume) of columns, not associated with additional loads from the newly installed equipment.
7. Change of aggregates in walls with stone, reinforced concrete and metal frames (up to 40%).
8. Change of dilapidated crowns of log or cobbled walls (up to 20% of the total surface of the walls).
9. Solid prokonopatka log or cobblestone walls.
10. Partial change of cladding, backfill and slab heaters of frame walls (up to 50% of the total wall area).
11. Change or repair of plating and heating of wooden plinths.
12. Repair of stone plinths of wooden walls with their re-laying up to 50% of the total volume.
13. Repositioning and replacement of worn-out clamps of log and cobbled walls.

III. Partitions

1. Repair, change and replacement of worn out partitions with more progressive designs of all types of partitions.
2. During the overhaul of partitions, partial redevelopment is allowed with an increase in the total area of ​​partitions not exceeding 20%.

IV. Roofs and coverings

1. Change of dilapidated wooden roof trusses or their replacement with prefabricated reinforced concrete.
2. Complete or partial replacement of dilapidated metal and reinforced concrete trusses, as well as replacement of metal ones with prefabricated reinforced concrete trusses.
3. Strengthening of trusses when replacing types of coverings (replacing wood slabs with prefabricated reinforced concrete, cold coverings with warm ones, etc.), when suspending lifting devices, as well as during corrosion of units and other elements of metal and prefabricated reinforced concrete trusses.
4. Partial or complete change of rafters, mauerlats and battens.
5. Repair of supporting structures of skylights.
6. Repair of devices for opening the bindings of skylights.
7. Partial or complete replacement of worn-out elements of coatings, as well as replacing them with more progressive and durable ones.
8. Partial (over 10% of the total roof area) or continuous change or replacement of all types of roofing.
9. Reconstruction of roofs in connection with the replacement of the roofing material.
10. Partial or complete replacement of wall gutters, slopes and covers of chimneys and other protruding devices above the roof.

V. Interfloor ceilings and floors

1. Repair or change of interfloor floors.
2. Replacement of individual structures or floors in general with more progressive and durable structures.
3. Reinforcement of all types of interfloor and attic floors.
4. Partial (more than 10% of the total floor area in the building) or continuous replacement of all types of floors and their bases.
5. Reconstruction of floors during repairs with replacement for stronger and more durable materials. In this case, the type of floors must comply with the requirements of the norms and technical conditions for new construction.

Vi. Windows, doors and gates

1. Complete replacement of dilapidated window and door blocks, as well as the gates of industrial buildings.

Vii. Stairs and porches

1. Partial or complete change of landings, ramps and porches.
2. Change and strengthening of all types of stairs and their individual elements.

VIII. Internal plastering, facing
and painting work

1. Renewal of plaster of all premises and repair of plaster in the amount of more than 10% of the total plastered surface.
2. Change of wall cladding in the amount of more than 10% of the total area of ​​the faced surfaces.
3. Continuous anti-corrosion painting of metal structures.

IX. Facades

1. Repair and renewal of cladding with an area of ​​more than 10% of the coated surface.
2. Full or partial (more than 10%) renewal of plaster.
3. Complete renewal of rods, cornices, belts, sandriks, etc.
4. Renewal of stucco details.
5. Solid color with stable compounds.
6. Cleaning the facade with sandblasting machines.
7. Change of balcony slabs and railings.
8. Change of coatings of protruding parts of the building.

1. Complete re-laying of all types of heating stoves, chimneys and their bases.
2. Re-equipment of furnaces for burning coal and gas in them.
3. Complete re-laying of cookers.

XI. Central heating

1. Change of individual sections and units of heating boilers, boilers, boiler units or complete replacement of boiler units (in the event that the boiler unit is not an independent inventory item).
2. Repair and replacement of expanders, condensation traps and other network equipment.
3. Repair and relocation of foundations for boilers.
4. Automation of boiler rooms.
5. Transfer from stove heating to central heating.
6. Change of heating registers.
7. Connection of buildings to heating networks (with a distance from the building to the network no more than 100 m).

XII. Ventilation

1. Partial or complete change of air ducts.
2. Change of fans.
3. Rewinding or changing electric motors.
4. Change of gates, deflectors, throttle valves, blinds.
5. Partial or complete change of ventilation ducts.
6. Change of heaters.
7. Change of heating units.
8. Change of filters.
9. Change of cyclones.
10. Change of individual chamber designs.

XIII. Plumbing and sewerage

1. Partial or complete change of the pipeline inside the building, including water supply and sewerage outlets.

XIV. Hot water supply

1. Change of coils and boilers.
2. Change of pipeline, parts and pumping units in general, tanks and pipeline insulation.

XV. Electric lighting and communication

1. Change of worn out sections of the network (more than 10%).
2. Change of safety guards.
3. Repair or restoration of cable channels.
4. During major overhaul of the network, it is allowed to replace the luminaires with other types (conventional ones with fluorescent ones).

B. BY STRUCTURES

Xvi. Water supply and sewerage facilities

a) Pipelines and network fittings

1. Partial or complete replacement of the anticorrosive insulation of the pipeline.
2. Change of individual sections of the pipeline (due to pipe wear) without changing the diameter of the pipes. At the same time, it is allowed to replace cast iron pipes with steel, ceramic pipes with concrete or reinforced concrete and vice versa, but it is not allowed to replace asbestos-cement pipes with metal ones (except in emergency cases).

3. Replacement of worn fittings, valves, fire hydrants, plungers, valves, water columns or their repair with replacement of worn out parts.
4. Change of individual pipes of siphons.

b) Wells

1. Repair of the cage of wells.
2. Change of hatches.
3. Stuffing the trays again to replace the destroyed ones.
4. Replacement of worn-out wooden wells.
5. Renewal of plaster.

c) Water intakes and hydraulic structures

1. Dams, dams, waterways, canals

1. Change or replacement of fastening of banks or slopes in the amount of up to 50%.
2. Replenishment of swollen slopes of earthen structures.
3. Change of ryazh.
4. Renewal of the protective layer in the underwater parts of reinforced concrete structures.
5. Change of gratings and nets.
6. Repair and replacement of panel gates.

2. Water wells

1. Construction and dismantling of an oil rig or installation and dismantling of an inventory rig.
2. Cleaning the well from collapses and silting.
3. Removing and installing a new filter.
4. Casing the well with a new casing string.
5. Replacement of water-lifting and air pipes.
6. Recovery of the well flow rate by torpedoing or flushing with hydrochloric acid.
7. Cementation of the annular space and drilling out of cement.

d) Treatment facilities

1. Repair and replacement of completely waterproofing.
2. Repair and renewal of plaster and ironwork.
3. Re-laying of brick walls and partitions up to 20% of the total volume of masonry in the structure.
4. Sealing leaks in reinforced concrete, concrete and stone walls and floors of structures with concrete dismantling in separate places and concreting again.
5. Continuous gunning of the walls of structures.
6. Repair of drainage around structures.
7. Replacement of tank hatches.
8. Replacing the grilles.
9. Replacing the loading of filters, biofilters, aerofilters.
10. Change of filter plates.
11. Replacement of pipelines and fittings.
12. Re-laying of the drainage system of the sludge platforms.

XVII. Heating

a) Channels and cameras

1. Partial or complete change of coverings of channels and chambers.
2. Partial or complete change of waterproofing of channels and chambers.
3. Partial re-laying of the walls of brick channels and chambers (up to 20% of the total surface of the walls).
4. Partial relocation of drainage systems.
5. Repair of the bottoms of canals and chambers.
6. Renewal of the protective layer in the reinforced concrete structures of channels and chambers.
7. Change of hatches.

b) Piping and fittings

1. Partial or complete replacement of the thermal insulation of the pipeline.
2. Renewal of the waterproofing of the pipeline.
3. Change of individual sections of the pipeline (due to pipe wear) without increasing the diameter of the pipes.
4. Change of fittings, valves, expansion joints or their repair with replacement of worn-out parts.
5. Replacement of movable and fixed supports.

Xviii. Access and in-plant railways

a) Subgrade

1. Widening of the subgrade in places of insufficient width to normal size.
2. Treatment of the subgrade in places of landslides, erosion, avalanches, abysses.
3. Restoration of all drainage and drainage devices.
4. Restoration of all protective and fortifying structures of the roadbed (sodding, paving, retaining walls).
5. Restoration of regulatory structures.
6. Correction, filling of bridge cones.
7. Change of individual structures of artificial structures or their replacement with other structures, as well as a complete change of pipes and small bridges (if they are not independent inventory objects, but are part of the subgrade).

b) Track structure

1. Cleaning the ballast layer or renewing the ballast with bringing the ballast prism to the dimensions established by the standards for this type of track.
2. Change of unusable sleepers.
3. Change of worn-out rails.
4. Change of unusable fasteners.
5. Straightening curves.
6. Repair of turnouts with replacement of individual elements and transition bars.
7. Change of turnouts.
8. Repair of the bridge deck.
9. Changing the flooring of the level crossings or replacing the wooden one with the reinforced concrete one.

c) Artificial structures (bridges, tunnels, pipes)

1. Partial change of elements or complete replacement of worn out superstructures.
2. Partial re-laying of stone and brick supports (up to 20% of the total volume).
3. Repair of concrete supports (up to 15% of the total).
4. Shotcrete or grouting of the surface of the supports.
5. The device on the supports of reinforcing reinforced concrete shells (shirts).
6. Repair or complete replacement of insulation.
7. Change of bridge beams.
8. Change of anti-theft bars.
9. Change of wood flooring.
10. Change of flooring from reinforced concrete slabs.
11. Change of counter rails.
12. Replacement of damaged elements of wooden bridges, excluding piles.
13. Replacement of wooden packages with reinforced concrete spans.
14. Partial re-laying of stone and brickwork in the arches and walls of the tunnels.
15. Injection of cement mortar behind the lining of the tunnel.
16. Repair and replacement of drainage devices in tunnels.
17. Repositioning the head of the pipes.
18. Change of elements of wooden pipes (up to 50% of the volume of wood).
19. Change of elements of reinforced concrete or concrete pipes (up to 50% of the volume).

XIX. Car roads

a) Subgrade

1. Treatment of the subgrade in places of landslides, landslides, erosion and depths.
2. Restoration of all drainage and drainage devices.
3. Restoration of all protective and strengthening structures of the roadbed.
4. Change of individual structures of artificial structures or their replacement with other structures, as well as a complete change of pipes and small bridges (if they are not independent inventory objects, but are part of the subgrade or road as a single inventory object).

b) Travel clothing

1. Leveling and replacing individual cement-concrete slabs.
2. Laying an asphalt concrete leveling layer on a cement-concrete pavement.
3. Arrangement of asphalt concrete pavement on roads with cement-concrete pavement.
4. Change of cement-concrete pavement to a new one.
5. Strengthening the asphalt concrete pavement.
6. Reconstruction of crushed stone and gravel surfaces.
7. Paving the pavement.
8. Profiling of dirt roads.

c) Bridges, pipes

1. Partial re-laying of stone and brick supports (up to 20% of the total volume).
2. Repair of concrete supports (up to 15% of the total).
3. Replacement of damaged elements of wooden bridges, with the exception of piles.
4. Change of wooden or reinforced concrete flooring, as well as replacement of wooden flooring with reinforced concrete.
5. Complete change or replacement of superstructures.
6. Repositioning of pipe heads.
7. Change of elements of wooden, reinforced concrete or concrete pipes (up to 50% of the volume).

d) Sites for cars, road construction
and other machines, storage areas, as well as sites
grain receiving points

1. Repair and restoration of drainage structures (trays, cuvettes, etc.).
2. Paving cobblestone areas.
3. Reconstruction of crushed stone and gravel surfaces of sites.
4. Repair of concrete sites with the laying of a leveling layer of concrete.
5. Leveling and replacing individual cement-concrete slabs.
6. Covering with asphalt concrete sites listed in items 2 - 5.

XX. Electrical networks and communications

1. Change or replacement of unusable fittings.
2. Replacement of hooks with traverses.
3. Change of wires.
4. Repair and replacement of end and connecting cable sleeves.
5. Repair or replacement of grounding devices.
6. Change of supports (up to 30% per 1 km).
7. Installation of cable wells.

XXI. Other structures

1. Repair, change or replacement for other supports of overpasses for air laying of pipelines.
2. Repair or change of platforms, ladders and fences of overpasses for air pipeline laying.
3. Repair or replacement of individual columns (up to 20%) of crane trestles.
4. Repair or replacement of crane beams of crane trestles.
5. Repair of galleries and ramps for fuel supply of boiler houses and gas generator substations with a change (up to 20%) of structures without changing the foundations.
6. Change or complete replacement of wooden fence posts (fences).
7. Repair or replacement of individual concrete and reinforced concrete pillars (up to 20%) and fences (fences).
8. Repair of individual sections of infills between fence posts (up to 40%).
9. Repair of individual sections of solid stone fences (up to 20%).
10. Repair of individual sections of solid adobe fences (up to 40%).
11. Repair of chimneys with the change or replacement of the lining, with the setting of hoops, with the restoration of the protective layer of reinforced concrete pipes.
12. Repair and replacement of individual links of metal chimneys.
13. Repair of ash and slag discharges with complete replacement of individual pipeline links (without increasing the diameter).
14. Repair of loading platforms with a complete change of wood flooring, blind area or asphalt. Change of individual supports or sections of retaining walls (up to 20%). In the event that the unloading area is part of a warehouse facility (ramp), a complete change or replacement of all structures is allowed.

An indicative list of works performed during the overhaul of the housing stock; Appendix 8 to the Resolution of the State Construction Committee of the Russian Federation of September 27, 2003 N 170 "On approval of the Rules and norms for the technical operation of the housing stock"

EXAMPLE LIST
WORKS PERFORMED DURING A CAPITAL REPAIR
HOUSING FUND

1. Inspection of residential buildings (including a complete survey of the housing stock) and the preparation of design estimates (regardless of the period of repair work).
2. Repair and construction work on the change, restoration or replacement of elements of residential buildings (except for the complete replacement of stone and concrete foundations, load-bearing walls and frames).
3. Modernization of residential buildings during their overhaul (redevelopment taking into account the downsizing of multi-room apartments; installation of additional kitchens and sanitary facilities, expansion of living space due to auxiliary premises, improvement of insolation of residential premises, elimination of dark kitchens and entrances to apartments through kitchens with a device, with necessary, built-in or attached premises for staircases, sanitary facilities or kitchens); replacement of stove heating with central heating with the installation of boiler rooms, heat pipelines and heating points; roof and other autonomous heat supply sources; re-equipment of furnaces for burning gas or coal; equipment with systems of cold and hot water supply, sewerage, gas supply with connection to the existing main networks at a distance from the input to the point of connection to the mains up to 150 m, the device of gas ducts, water pumping, boiler rooms; complete replacement of existing central heating systems, hot and cold water supply (including with the obligatory use of modernized heating devices and pipelines made of plastic, metal-plastic, etc. and a ban on the installation of steel pipes); installation of household electric stoves instead of gas stoves or kitchen fireplaces; installation of elevators, garbage chutes, pneumatic garbage disposal systems in houses with an elevation of the staircase of the upper floor of 15 m and higher; transfer of the existing power supply network to increased voltage; repair of television antennas for collective use, connection to a telephone and radio broadcasting network; installation of intercoms, electric locks, installation of fire-prevention automation and smoke removal systems; automation and dispatching of elevators, heating boilers, heating networks, engineering equipment; improvement of courtyard areas (paving, asphalting, landscaping, fencing, wood sheds, equipment for children and household playgrounds). Repair of roofs, facades, joints of prefabricated buildings up to 50%.
4. Thermal insulation of residential buildings (work to improve the heat-shielding properties of enclosing structures, installation of window fillings with triple glazing, installation of external vestibules).
5. Replacement of intra-quarter utilities.
6. Installation of metering devices for heat energy consumption for heating and hot water supply, cold and hot water consumption for a building, as well as installation of hot and cold water meters for apartments (when replacing networks).
7. Reconstruction of non-ventilated combined roofs.
8. Architectural supervision of design organizations over the overhaul of residential buildings with full or partial replacement of floors and redevelopment.
9. Technical supervision in cases when subdivisions for technical supervision of capital repairs of the housing stock have been created in local government bodies and organizations.
10. Repair of built-in rooms in buildings.

List of works on overhaul of buildings and structures; Appendix 9 to the Order of the Ministry of Justice of Russia dated September 28, 2001 N 276 (as amended on January 24, 2006) "On approval of instructions for the technical operation of buildings and structures of institutions of the penal system")

Appendix 9

LIST OF WORKS ON OVERALL REPAIRS OF BUILDINGS AND STRUCTURES

1.1. Foundations.
1.1.1. Changing wooden chairs or replacing them with stone or concrete pillars.
1.1.2. Partial re-laying (up to 15%), as well as reinforcement of foundations and basement walls under the outer and inner walls and pillars of stone and wooden buildings, not associated with the building superstructure or with additional loads from newly installed equipment.
1.1.3. Reinforcement of foundations for foundations of stone buildings that are not associated with the superstructure of the building.
1.1.4. Restoration of vertical and horizontal insulation of foundations.
1.1.5. Restoration of a settled existing or device of a new blind area around the building (more than 20% of the total area of ​​the blind area) in order to protect the soil under the foundations from erosion or waterlogging.
1.1.6. Repair of the brick cladding of the foundation walls from the basement side in separate places with the re-laying of more than 10 bricks in one place.
1.1.7. Partial or complete restoration or installation of new waterproofing in basements.
1.1.8. Partial or complete re-laying of pits at the windows of the basement and basement floors.
1.1.9. Replacement of rotten wooden foundation chairs in wooden buildings with new wooden, brick, concrete or reinforced concrete pillars.
1.1.10. Renovation of existing drains around the building.
1.1.11. Replacement of single collapsing stone and concrete pillars.
Note. At the expense of funds for major repairs, it is possible to artificially consolidate the soils of the foundations of the foundations by chemical, thermal and other methods.

1.2. Walls and columns.
1.2.1. Re-laying of brick plinths (more than 10 bricks in one place).
1.2.2. Sealing cracks in brick or stone walls with clearing furrows, with bandaging seams with old masonry.
1.2.3. Installation and repair of structures that strengthen stone walls.
1.2.4. Re-laying of dilapidated brick cornices, lintels, parapets, pits and protruding parts of the walls.
1.2.5. Full or partial re-laying and fastening of individual dilapidated sections of brick walls (up to 25% of their total area in the building), not associated with the superstructure of the building or with additional loads from newly installed equipment, as well as replacement of individual crowns in wooden buildings, which also do not exceed 25% the common surface of the walls.
1.2.6. Strengthening the walls with tension and metal ties.
1.2.7. Change of fillings in walls with stone, reinforced concrete and metal frames (up to 40%).
1.2.8. Sealing cracks in brick walls with excavation and clearing of old masonry and installation of new ones, with bandaging seams with old masonry.
1.2.9. Restoration of the waterproofing layer of the entire horizontal plane along the edge of the foundation.
1.2.10. Fastening or strengthening stone walls that deviate from the vertical position and have deformations.
1.2.11. Re-laying of dilapidated cornices, parapets, firewalls, pits and protruding parts of the walls.
1.2.12. Repositioning of individual, worn-out, window and door lintels.
1.2.13. Warming of dilapidated wooden walls by stripe boards on the roofing or with additional boarding and backfilling with fine slag.
1.2.14. Partial dismantling of existing internal walls and laying of new ones (up to 25% of the total volume), associated with the redevelopment of premises.
1.2.15. Replacement different types aggregates in walls with stone, reinforced concrete and metal frames (up to 50% of the total wall area).
1.2.16. Change of dilapidated crowns of log or cobbled walls (up to 20%).
1.2.17. Solid prokonopatka log or cobblestone walls.
1.2.18. Partial change of cladding, backfill and slab insulation of frame walls (up to 50% of the total wall area).
1.2.19. Change or repair of plating and insulation of wooden plinths.
1.2.20. Repair of stone plinths of wooden walls with their re-laying up to 50% of the total volume.
1.2.21. Repositioning and replacement of worn-out clamps of log and cobbled walls.
1.2.22. Strengthening reinforced concrete and stone columns with clips.
1.2.23. Repair and partial replacement (up to 20%) of columns not associated with additional loads from newly installed equipment.

1.3. Partitions.
1.3.1. Repair, change and replacement of worn out partitions with more progressive designs.
1.3.2. Partial redevelopment with an increase in the total area of ​​partitions (up to 20%).
1.3.3. Repair of partitions with the replacement of unusable straps and boards in an amount of more than 2 m2 in one place.
1.3.4. Strengthening the sound insulation of partitions by upholstering them with an additional layer of hardboard, cardboard or other materials, followed by applying a layer of plaster, wallpapering or painting.
1.3.5. Replenishment of the backfill of two-layer partitions, followed by boarding and all finishing works.

1.4. Roofs and roofs.
1.4.1. Replacement of formwork boards in places of grooves and cornice slopes.
1.4.2. Replacement of dilapidated roof structures with a roof made of ready-made reinforced concrete elements coated with tar paper, roofing felt and other roofing materials.
1.4.3. Full or partial replacement of dilapidated metal and reinforced concrete trusses.
1.4.4. Strengthening of trusses when replacing the types of coatings (wood slabs for precast concrete, cold coatings for warm ones, etc.), as well as in case of corrosion of units and other elements of metal and precast concrete trusses.
1.4.5. Partial or continuous change of rafters, Mauerlats and roof battens.
1.4.6. Repair or replacement of worn metal roof railings.
1.4.7. Repair or replacement of worn out outdoor fire escapes.
1.4.8. Arrangement of new manholes on the roof, skylights and transition bridges to them.
1.4.9. Relocation of chimney and ventilation pipes on the roof.
1.4.10. Complete replacement of dilapidated wall gutters, slopes and coverings around chimneys and other protruding devices above the roof.
1.4.11. Reconstruction of light lanterns with low illumination of premises for a large one.
1.4.12. Repair and painting of supporting structures of skylights.
1.4.13. Repair of mechanical and manual opening and closing devices for bindings of skylights.
1.4.14. Partial or complete replacement of worn-out elements of the coating, as well as replacing them with more progressive and durable ones.
1.4.15. Partial (more than 10%) or continuous change or replacement of the roof (all types).
1.4.16. Reconstruction of roofs due to the replacement of roofing materials.
1.4.17. Repair of coatings around smoke and ventilation pipes, firewalls, parapets and other protruding parts on the roof.
1.4.18. Strengthening parapets, steel fencing gratings, repairing ventilation shafts, gas ducts, sewer risers and other protruding parts on the roof.
1.4.19. Restoration and repair of ladders for the safety of cleaning chimneys on roofs with soft surfaces or steep slopes.
1.4.20. Maintenance of outdoor fire escapes for access to the roof.

1.5. Interfloor ceilings and floors.
1.5.1. Repair or change of interfloor and attic floors.
1.5.2. Replacement of individual floor beams, extension of the ends of the beams with prostheses with all subsequent work. Replacing the pick between the beams.
1.5.3. Replacement of individual structures or floors in general with more progressive and durable structures.
1.5.4. Strengthening all elements of interfloor and attic floors.
1.5.5. Shotcrete of reinforced concrete floors in case of damage.
1.5.6. Partial (more than 10%) or continuous change of sexes (all types) and their bases.
1.5.7. Reconstruction of floors during repairs with replacement for stronger and more durable ones, while the type of floors must comply with the requirements of norms and technical conditions for new construction.
1.5.8. Reconstruction of the concrete sub-floor with a new floor.
1.5.9. Re-laying of clean plank floors with leveling of the logs and adding new material.
1.5.10. Re-laying of parquet floors with fixing or replacing the battens.
1.5.11. Re-laying the floors on the joists in the first floors with the correction or replacement of the base and the restoration of brick posts.
1.5.12. Repair or replacement of walls of underground channels.

1.6. Windows, doors and gates.
1.6.1. Complete replacement of dilapidated window and door blocks, as well as gates.

1.7. Stairs and porches.
1.7.1. Partial or complete change of landings, ramps and porches.
1.7.2. Change or strengthening of all types of stairs and their individual elements.
1.7.3. Replacement or repair of handrails and handrails of stairs over 5% of their total.
1.7.4. Arrangement of new porches.
1.7.5. Change of metal stringers or welding of damaged parts of stringers.

1.8. Internal plastering, facing and painting works.
1.8.1. Renewal of plaster of all premises and repair of plaster in the amount of more than 10% of the total plastered surface.
1.8.2. Upholstery of walls and ceilings with dry plaster.
1.8.3. Restoration or replacement of wall cladding in the amount of more than 10% of the total area of ​​cladding surfaces.
1.8.4. Renewal of stucco details inside the premises.
1.8.5. Painting of window sashes, doors, ceilings, walls and floors after overhaul of these structures.
1.8.6. Oil painting of radiators, heating pipes, water supply, sewerage, gasification after overhaul of the system or new installation of it, if the costs are carried out at the expense of overhaul funds.
1.8.7. Continuous anti-corrosion painting of metal structures.

1.9. Facades.
1.9.1. Repair and renewal of cladding with an area of ​​more than 10% of the cladded surface of the facades of buildings with the replacement of individual tiles with new ones or plastering these places with subsequent painting to match the color of the facing slabs.
1.9.2. Full or partial (more than 10%) renewal of plaster.
1.9.3. Restoration or alteration of rods, cornices, belts, sandrids and other protruding parts of building facades.
1.9.4. Complete replacement and installation of new drainpipes, as well as all external metal and cement coatings on the protruding parts of the facades of buildings.
1.9.5. Restoration of modeling and stucco decorations and details.
1.9.6. Continuous painting of building facades with stable compounds.
1.9.7. Change or installation of new gratings and fences on the roofs and balconies of buildings.
1.9.8. Cleaning of facades and plinths with sandblasting machines.
1.9.9. Change or reinforcement of all supporting and enclosing structures of balconies and bay windows.
1.9.10. Change of coatings of protruding parts of the building.
1.9.11. Restoration of old or installation of new gates.
1.9.12. Oil painting of facades of wooden buildings.

1.10. Stoves and hearths.
1.10.1. Repair, alteration and installation of new stoves, kitchen hearths, embedded boilers and chimneys for them.
1.10.2. Complete re-laying or installation of new heating stoves, chimneys, ventilation ducts and chimneys and their foundations.
1.10.3. Conversion of heating stoves from wood-burning to gas heating or to heating with solid fuel.

1.11. Central heating.
1.11.1. Installation of central heating instead of the stove with the adaptation of the existing room for the boiler room and installation of the boiler room. In some cases, if it is impossible to adapt the existing premises to the boiler room, it is allowed to add an extension to the existing building with a building area of ​​no more than 65 m2 or to build a new boiler room building.
1.11.2. Change of individual sections and assemblies of heating boilers, boilers, boiler units or complete replacement of boiler units (if they are not independent inventory items).
1.11.3. Replacement of the existing central heating piping.
1.11.4. Repair and replacement of expanders, condensation traps and other network equipment.
1.11.5. Arrangement of external furnaces and accessories for boilers for a blast furnace.
1.11.6. Change and re-installation of additional sections of heating devices and individual sections of the pipeline.
1.11.7. Repair, relocation or re-installation of foundations for boilers and other equipment.
1.11.8. Boiler room automation.
1.11.9. Change of insulation of pipelines that have fallen into disrepair.
1.11.10. Repositioning the lining of the boiler and chimneys.
1.11.11. Placing patches on a steel boiler, boiler, steam boiler, tank.
1.11.12. Manufacturing and installation of a new casing.
1.11.13. Restoration or installation of new lining and lining of central heating boilers.
1.11.14. Replacement of worn-out metal chimneys from boiler rooms.
1.11.15. Change of heating registers.
1.11.16. Connection of buildings to heating networks (with a distance from the building to the network no more than 100 m).

1.12. Ventilation.
1.12.1. The device of a new, restoration or reconstruction of the ventilation system.
1.12.2. Partial or complete change of air ducts.
1.12.3. Change of fans.
1.12.4. Rewind or change electric motors.
1.12.5. Change of gates, deflectors, throttle valves, blinds.
1.12.6. Partial or complete replacement of ventilation ducts.
1.12.7. Change of heaters.
1.12.8. Change of heating units.
1.12.9. Change of filters.
1.12.10. Change of cyclones.
1.12.11. Change of individual designs of ventilation chambers.

1.13. Plumbing and sewerage.
1.13.1. Restoration or installation of a new internal water supply and sewerage system of the building, pipelines, including water supply and sewerage inlets and their connection to the water supply and sewer networks... The length of the line from the nearest water supply or sewer outlet to the street network should not exceed 100 m.
1.13.2. Installation of new indoor water intakes.
1.13.3. Installation of additional inspection chambers on existing yard lines or street networks at the points of connection.
1.13.4. Relocation of underground water and sewer pipes.
1.13.5. Replacement of cast-iron lavatory cisterns with flush taps with alteration of the piping and shortening of the flush pipe.
1.13.6. Replacement of taps, valves and sanitary fittings.
1.13.7. The device of water pumps.
1.13.8. Installation of new sanitary facilities.

1.14. Hot water supply.
1.14.1. Change and installation of new hot water supply.
1.14.2. Change of individual sections of the hot water supply pipeline.
1.14.3. Replacement of worn-out tanks, water heaters and water heaters.
1.14.4. Repair of tanks, coils and boilers associated with complete disassembly and replacement of individual units and parts.
1.14.5. Change of pipeline, parts and pumping units in general, tanks and pipeline insulation.
1.14.6. Change and installation of baths, showers and fittings for them (shower nets with piping, water taps, flexible hoses).

1.15. Electric lighting, communications and power wiring.
1.15.1. Installation of new electric lighting in residential and public buildings and connection to the mains supply.
1.15.2. Replacement of worn-out lighting electrical wiring with the change of installation fittings (switches, knife switches, plugs, sockets, sockets), and during a major overhaul of the building - the installation of a new electrical wiring.
1.15.3. Installation of new and replacement of group distribution and safety boxes and shields.
1.15.4. Reconstruction of the electrical wiring with the installation of additional fittings in connection with the redevelopment of the premises.
1.15.5. Automation of electric lighting in the stairwells of buildings.
1.15.6. Replacement of metering devices and protection devices for electrical installations.
1.15.7. Repair or restoration of cable channels.
1.15.8. Replacement of lamps with other types (conventional for fluorescent, etc.).

1.16. Gas supply.
1.16.1. Installation of additional gas equipment in apartments with its connection to the gas network.
1.16.2. Gasification of individual apartments.
1.16.3. Change of individual sections of the gas pipeline.
1.16.4. Replacement of worn-out equipment (gas stoves, water heaters) with new equipment.

1.17. Elevators and lifts.
1.17.1. Re-installation of elevators with all types of construction and installation work.
1.17.2. Full or partial replacement of electrical equipment and elevator cargo winches.
1.17.3. Strengthening, full or partial change of metal structures and mine fence mesh.
1.17.4. Complete or partial change of electrical wiring in mines.
1.17.5. Dismantling and installation of elevator equipment in connection with work to reduce noise in rooms with constant presence of people.
1.17.6. Elevator automation.

2. Structures

2.1. Water supply and sewerage facilities. Pipelines and network fittings.
2.1.1. Partial or complete replacement of the anticorrosive insulation of the pipeline.
2.1.2. Change of individual sections of the pipeline without changing the diameter of the pipes. At the same time, it is allowed to replace cast iron pipes with steel, ceramic pipes with concrete or reinforced concrete and vice versa, but it is not allowed to replace asbestos-cement pipes with metal ones (except in emergency cases).
The length of the network sections, on which a continuous change of pipes is allowed, should not exceed 200 m per 1 km of the network.
2.1.3. Change of worn fittings, valves, fire hydrants, plungers, valves, water columns or their repair with replacement of worn out parts.
2.1.4. Change of individual pipes of siphons.

2.2. Water supply and sewerage networks. Wells.
2.2.1. Well masonry repair.
2.2.2. Change of hatches.
2.2.3. Stuffing the trays again to replace the destroyed ones.
2.2.4. Replacement of worn-out wooden wells.
2.2.5. Renewal of plaster.

2.3. Water supply and sewerage networks. Treatment facilities.
2.3.1. Repair or replacement (completely) of waterproofing.
2.3.2. Repair and renewal of plaster and ironwork.
2.3.3. Re-laying of brick walls and partitions (up to 20% of the total volume of masonry in the structure).
2.3.4. Sealing leaks in reinforced concrete, concrete and stone walls and floors of structures with concrete dismantling in separate places and concreting again.
2.3.5. Continuous gunning of the walls of structures.
2.3.6. Repair of drainage around structures.
2.3.7. Replacement of tank hatches.
2.3.8. Replacement of grilles.
2.3.9. Replacing the loading of filters, biofilters, aerofilters.
2.3.10. Replacement of pipelines and fittings.
2.3.11. Change of filter plates.
2.3.12. Re-laying of the drainage system of the sludge platforms.

2.4. Heating. Channels and cameras.
2.4.1. Partial or complete change of coverings of channels and chambers.
2.4.2. Partial or complete change of waterproofing of channels and chambers.
2.4.3. Partial re-laying of the walls of brick channels and chambers (up to 20% of the total surface of the walls).
2.4.4. Partial relocation of drainage systems.
2.4.5. Repair of the bottoms of canals and chambers.
2.4.6. Renewal of the protective layer in the reinforced concrete structures of channels and chambers.
2.4.7. Change of hatches.

2.5. Heating. Pipelines and fittings.
2.5.1. Partial or complete replacement of the thermal insulation of the pipeline.
2.5.2. Renewal of waterproofing pipelines.
2.5.3. Change of individual sections of the pipeline without increasing the diameter of the pipes.
2.5.4. Change of fittings, valves, expansion joints or their repair with replacement of worn out parts.
2.5.5. Replacement of movable and fixed supports.

2.6. Car roads. Earthen bed.
2.6.1. Treatment of subgrade in places of landslides, landslides, erosion and depths.
2.6.2. Restoration of drainage and drainage devices.
2.6.3. Restoration of protective and strengthening structures of the roadbed.
2.6.4. Change of individual structures of artificial structures or their replacement with other structures, as well as a complete change of pipes and small bridges (if they are not independent inventory objects, but are part of the subgrade or road as a single inventory object).

2.7. Car roads. Travel clothing.
2.7.1. Leveling and replacing individual cement-concrete slabs.
2.7.2. Laying of an asphalt concrete leveling layer on a cement-concrete pavement.
2.7.3. Installation of asphalt concrete pavement on roads with cement-concrete pavement.
2.7.4. Change of cement-concrete pavement to a new one.
2.7.5. Strengthening the asphalt concrete pavement.
2.7.6. Reconstruction of crushed stone and gravel surfaces.
2.7.7. Paving the pavement.
2.7.8. Profiling of dirt roads.

2.8. Warehouse and other sites.
2.8.1. Repair and restoration of drainage structures (trays, cuvettes, etc.).
2.8.2. Paving cobblestone areas.
2.8.3. Reconstruction of crushed stone and gravel surfaces of sites.
2.8.4. Repair of concrete sites with the laying of a leveling layer of concrete.
2.8.5. Leveling and replacing individual cement-concrete sites.
2.8.6. Coverage of sites with asphalt concrete.

2.9. Electrical networks and communications.
2.9.1. Change or replacement of fittings.
2.9.2. Replacing hooks with traverses.
2.9.3. Change of wires.
2.9.4. Repair and replacement of end and connecting cable sleeves.
2.9.5. Repair or replacement of grounding devices.
2.9.6. Change of supports (up to 30% per 1 km).
2.9.7. Installation of cable wells.

2.10. Other structures.
2.10.1. Repair, change or replacement for other supports of overpasses for air pipelines.
2.10.2. Repair and replacement of platforms, stairs and fences of overpasses for air pipelines.
2.10.3. Repair or replacement of individual columns (up to 20%) of crane trestles.
2.10.4. Repair or replacement of crane beams of crane trestles.
2.10.5. Repair of galleries and ramps for fuel supply of boiler houses and gas generator substations with a change (up to 20%) of structures without changing the foundations.
2.10.6. Change or complete replacement of wooden fence posts.
2.10.7. Repair or replacement of individual concrete and reinforced concrete pillars (up to 20%) of fences.
2.10.8. Repair of individual sections of fencing elements (up to 40% infill between posts).
2.10.9. Repair of individual sections of solid stone fences (up to 20%).
2.10.10. Repair of individual sections of solid adobe fences (up to 40%).
2.10.11. Repair of chimneys with the change or replacement of the lining, with the setting of hoops, with the restoration of the protective layer of reinforced concrete pipes.
2.10.12. Repair and replacement of individual links of metal chimneys.
2.16.13. Repair of ash and slag discharges with complete replacement of individual pipeline links (without increasing the diameter).
2.12.14. Repair of loading platforms with a complete change of wood flooring, blind area or asphalt. Change of individual supports or sections of retaining walls (up to 20%). If the unloading area is part of a warehouse facility (ramp), a complete change or replacement of all structures is allowed.

The list of work on the overhaul of apartment buildings to be included in the scope of work financed from the funds provided for by Federal Law N 185-FZ; Table 2.3 ( "Methodological recommendations on the formation of the scope of work on the overhaul of apartment buildings financed from the funds provided for by the Federal Law of July 21, 2007 N 185-FZ" On the Fund for Assistance to Reforming Housing and Communal Services "(approved by the State Corporation" Fund for Assistance to Reforming Housing and Communal Services " 02/15/2013)

This list is formed on the basis of the revised lists of overhaul works recommended by the above regulatory documents within the framework of the types of work on the overhaul of apartment buildings, determined by Article 15 of Federal Law N 185-FZ. At the same time, it is assumed that the provisions of these guidelines apply to apartment buildings subject to major repairs without stopping their operation. As a result of the overhaul, all the necessary work must be performed to bring the common property of an apartment building into a technically sound condition by restoring or replacing all parts of structures and engineering systems that have more short time service between successive (according to the standard service life) major overhauls than load-bearing structures.

2.3.2. Consistent and methodological linking of technological processes to the list of works given in Table 2.3 of these recommendations is contained in Section 3.

Table 2.3

The name of the types of work in accordance with Part 3 of Article 15 of Federal Law N 185-FZ

Subspecies and list of works

Repair of in-house engineering systems of electrical, heat, gas, water supply, sewerage

1. Repair or replacement of engineering systems:

1.1. Cold water supply, including:

1.1.1. Repair or replacement of water metering units;

1.1.2. Repair or replacement of distribution lines and risers;

1.1.3. Replacement of shut-off valves, including on the branch from the risers to the apartment;

1.1.4. Repair or replacement in the complex of booster equipment pumping units

1.1.5. Repair or replacement of equipment, pipelines and fittings of a fire water supply system

1.2. Repair or replacement of the hot water supply system, including:

1.2.1. Repair or replacement of TRZh, heat exchangers, boilers, pumping units and other equipment (as part of common property) in the complex for the preparation and supply of hot water to the distribution network;

1.2.2. Repair or replacement of distribution lines and risers;

1.2.3. Replacement of shut-off valves, including on the branch from the risers to the apartment.

1.3. Repair or replacement of the sewerage and drainage system, including:

1.3.1. Repair or replacement of outlets, prefabricated pipelines, risers and hoods;

1.3.2. Replacement of valves, if any;

1.4. Repair or replacement of the heating system, including;

1.4.1. Repair or replacement of distribution lines and risers;

1.4.2. Replacement of shut-off and control valves, including on the branch from risers to heating devices in residential premises;

1.4.3. Rearrangement or replacement of heating devices in public places and replacement of heating devices in residential premises that do not have disconnecting devices;

1.4.4. Installation, repair or replacement in the complex of ITP equipment (individual heating points) and in the presence of booster pumping units

1.5. Repair or replacement of the gas supply system, including:

1.5.1. Repair or replacement of in-house distribution lines and risers;

1.5.2. Replacement of shut-off and control valves, including on the branch from risers to household gas appliances in residential premises;

1.6. Repair or replacement of the power supply system, including:

1.6.1. Repair or replacement of the main switchboard (main switchboard), distribution and group boards;

1.6.2. Repair or replacement of in-house distribution highways and risers of communal and apartment lighting;

1.6.3. Replacement of branches from floor panels or boxes of apartment meters and installation and lighting devices for communal lighting;

1.6.4. Replacement of electrical networks to power the electrical equipment of elevators and electrical equipment to ensure the operation of engineering systems;

2. Modernization of engineering systems, including:

2.1. Mandatory use of modernized heating devices and pipelines made of plastic, metal-plastic, etc. and a ban on the installation of steel pipes

2.2. Transfer of the existing power supply network to increased voltage;

2.3. Replacement of lighting devices for the needs of municipal lighting with energy-saving ones;

2.4. Re-equipment of heat points and water metering units;

3. Replacing stove heating with central heating

with device

boiler rooms,

heat pipelines and

heat points;

roof and other autonomous heat supply sources

4. Equipment by systems

cold and

hot water supply,

sewers,

gas supply

with accession

to existing backbone networks with a distance from the input to the point of connection to the highways up to 150 m,

device

gas ducts,

water pump,

boiler rooms.

Repair or replacement of elevator equipment found unsuitable for operation, if necessary, repair of elevator shafts

Repair and replacement of elevator equipment with its modernization, including:

1. Repair or complete replacement of elevator equipment found unsuitable for use;

2. Repair, if necessary, of mines, replacement of attached mines;

3. Repair of machine rooms;

4. Repair, replacement of automation elements and dispatching of elevator equipment;

5. Equipment of devices required for connection to existing systems; automation and dispatching of elevator equipment

Roof repair

1. Repair of roof structures:

1.1. From wooden structures:

1.1.1. Repair: with partial replacement

Rafter legs,

Mauerlatov

Solid and discharged battens made of bars

1.1.2. Antiseptic and fireproofing of wooden structures.

1.1.3. Insulation of the under-roof (attic) floor

1.1.4. Repair (replacement of dormer windows)

1.2. From reinforced concrete rafters and roof decks:

1.2.1. Elimination of malfunctions of reinforced concrete rafters and roof decks;

1.2.2. Insulation of the under-roof (attic) floor

1.2.3. Repair of screed for roofing;

2. Replacement of roof coverings

2.1. Complete replacement of the metal roof covering with an abutment device;

2.2. Complete replacement of a roof covering made of rolled bitumen materials (roofing felt) on a roof made of welded materials with a device for abutments

2.3. Complete replacement of the roof covering made of piece materials (slate, tiles, etc.) with an abutment device

3. Repair or replacement of the drainage system (overhangs, gutters, gutters, trays) with the replacement of drainpipes and products (external and internal);

4. Repair or replacement of roof elements

4.1. Repair of manholes on the roof

4.2. Repair of air vents, repair or replacement of dormers and other devices for ventilation of the attic space;

4.3. Change of caps on the tops of smoke ventilation blocks and ventilation shafts;

4.4. Change of coverings for parapets, firewalls, add-ons

4.5. Repair (plastering, painting) and insulation of smoke ventilation blocks and elevator shafts

4.6. Restoration or replacement of the fencing on the attic roof;

5. Conversion of non-ventilated combined roofs to ventilated ones with insulation of the under-roof (attic) overlap

Repair of basements related to common property in apartment buildings

1. Repair of sections of basement walls and floors

2. Insulation of walls and basement ceilings of basements

3. Waterproofing walls and basement floor

4. Repair of technical rooms with the installation of metal doors.

5. Repair of air vents, basement windows, pits and external doors

6. Sealing of passages of inputs and outputs of engineering networks in the outer walls (performed when repairing networks)

7. Repair of the blind area

8. Repair or replacement of the drainage system

Insulation and repair of facades

1. Repair of facades that do not require insulation

1.1. Repair of plaster (textured layer), including an architectural order;

1.2. Repair of facing tiles;

1.3. Painting over plaster or textured layer;

1.4. Repair and restoration of sealing of horizontal and vertical joints of wall panels of large-block and large-panel buildings;

1.5. Repair and restoration from the side of the facade of sealing the joints of window and door openings in public places;

1.6. Painting from the side of the facade of the window frames;

1.7. Repair of enclosing walls;

1.8. Repair and replacement of windows and balcony doors (as part of common property);

1.9. Repair or replacement of external entrance doors.

2. Works on the repair of facades requiring insulation

2.1. Repair and insulation of enclosing walls with subsequent surface finishing

2.2. Repair of windows and balcony doors (as part of common property) or replacement with windows and doors in an energy-saving design (window blocks with triple glazing, etc.) with their subsequent insulation (sealing)

2.3. Repair of external entrance doors with their subsequent insulation or replacement with metal doors in an energy-saving design

3. Works common for both groups of buildings

3.1. Repair of balconies with replacement, if necessary, of consoles, waterproofing and sealing, followed by painting

3.2. Reinforcement of canopy structures above entrances and top floors with subsequent surface finishing

3.3. Reinforcement of eaves block structures with subsequent surface finishing

3.4. Change of window sills

3.5. Change of drainpipes

3.6. Repair and insulation of the basement

Installation of collective (common house) resource consumption meters and control units (heat energy, hot and cold water, electric energy, gas)

Installation of collective (common house) consumption metering devices:

Thermal energy for heating and hot water supply;

Consumption of cold water,

Electric energy,

Resource control nodes, with equipment for automation and dispatching devices to provide remote accounting and control;

Repair of the foundations of apartment buildings.

1. Work on the repair or replacement of foundations.

1.1. Sealing and pointing of joints, seams, cracks in foundation elements. Protective layer device.

1.2. Elimination of local defects and deformations by strengthening the foundation.

Notes:

1. During overhaul of structures and engineering systems as part of the common property of an apartment building, as defined by Federal Law 185-FZ, at least 50% of each structure and engineering system is replaced.

2. Intra-house heating systems as part of common property include: risers, heating elements in public places, in residential premises - branches from risers to the first disconnecting device (in its absence - to the place of interface with a heating device, heating element), regulating and shut-off valves; collective (general house) heat energy metering devices, as well as other equipment located on these networks.

3. In the event that during the overhaul of structures and engineering systems as part of the common property of MD, due to the technological and design features of the structures and engineering systems being repaired, it is necessary to dismantle or destroy parts of the property that is not part of the common property of MD , work on its restoration is carried out at the expense of capital repairs, which should be provided for in the design and estimate documentation.

4. In the event that a heating system with a hidden pipeline laying is designed in an apartment building that is not repairable (Appendix 2), during the overhaul, it is allowed to re-install the heating system with an open laying of pipelines and heating devices, heating elements, including in living quarters.

A wave of major home renovations swept Moscow in 2015. According to it, throughout the city will be carried out repair work of houses in order to improve living conditions. But many residents of Moscow are at a loss as to where to find the necessary information and find out everything about this process.

What is overhaul?

According to the legally approved document, from mid-2015, the costs of capital repairs of houses are transferred entirely to Muscovites. Each house - or rather, its tenants - has the right to choose where the collected money will be stored until it is needed. You can save them on a specially created account at home, or you can transfer them directly to the city fund. Finances are transferred to the main fund within three months from the date of their accumulation in full.

Regardless of the storage location, when it comes time to overhaul the house, the money goes to the purchase necessary materials... Today, the concept of "overhaul" is divided into two components:

The first is the specific positions of what is being renovated in the house. These can be roofs, pipes for water supply or heating, or all at once.

The second is how this renovation is carried out. Employees should never repair "something now, and something later" without objective reasons. According to the program, all systems that require repair are being repaired in one house at a time.

It's important to know: Suppose an unforeseen situation still happened, and the builders postponed some part of the repair for several weeks. In this case, before the next stage of repair, specialists must come to the building to check its condition: whether anything has deteriorated during the absence of workers. If the builders started the second repair without expert examination, this is a violation.

What is being repaired?

Builders do not upgrade appearance facades or painting the walls of the entrance. Their job is to change poorly performing engineering systems. And if the facade is being repaired, it means that it is emergency and poses a threat to the health or even the life of the inhabitants of the house.

Other aspects of renovation that a home might hypothetically require include:

  • renovation of water pipes;
  • replacement of gas pipes;
  • reinforcement or complete replacement of the roof deck;
  • work in basements, elimination of cracks in the foundation;
  • repair of electrical networks.

On an individual basis, other problems of house operation can be found, which also need to be eliminated.

Which houses are not included in the overhaul program?

The program is designed for 30 years, so every year new buildings to be renovated appear. At the same time, the list cannot be supplemented with houses that:

  • subject to resettlement and demolition according to the renovation program;
  • will be demolished in the near future due to the accident rate;
  • will be reconstructed;
  • consist of one or two apartments.

If your home does not meet any of these requirements, but still has not appeared in the line for a major overhaul, you need to be patient. In the first half of 2017, the list was replenished with three hundred buildings, and this is not the limit.

How can I track the status of my home renovation?

In order to find your home and find out all the information about planned or ongoing repair work, there is no need to call any institutions or go to the housing and communal services with questions. It is enough to go to the website https://pgu.mos.ru/ru/. This is a special site created by the Moscow Mayor's Office to monitor the situation in the city.

Here you can find out if the house is included in the renovation program, complain about the noise during the work and, of course, check the status of the renovation of your house.

The guide to action is as follows:

1. We go to the site and see a redirect to this page:

2. Since we are looking for information about housing, you need to click on the item "Housing, housing and communal services, yard". The menu will change to this:

3. Now you should select the "Apartment building and courtyard" item:

4. Here you can check the list of houses included in the renovation program, and thus make sure that if your house is located in poor condition and requires the replacement of some structures, it will not be demolished in the near future - accordingly, it will be possible to wait in line for a major overhaul. We are mainly interested in the line "Find out everything about the overhaul", which will redirect to the following page:

5. By clicking on the item "When and what work is being carried out on overhaul", you will find yourself on a page with information, among which these lines are most of all interested:

Thus, you will have at your disposal full list addresses of houses that must be completely renovated by the end of 2017.

What to do if the repairs are carried out poorly or not on time?

If the site of public services claims that work should be carried out on your territory, but there are no builders.

Or if they have already left and the repaired systems break down again, a complaint must be filed. There are many instances that you can contact, but the most effective among them is the website of the Fund for Capital Repair of the City of Moscow.

In order for the appeal to be recorded and sent to the address, it is necessary to comply with a number of requirements: indicate the correct name and correct email address. It is also forbidden to use obscene language or threats towards anyone in circulation.

The answer can be expected both to the email and to the postal address, if the latter is indicated in the appeal. You can support a letter with documents, but in an amount of no more than ten pieces.


House management

The deadlines for overhaul in apartment buildings (MKD) are determined by the regional program developed by the authorities of the constituent entity of the Federation. It is formed for the period required for major repairs in all apartment buildings located in the region and is calculated until 2043. The sequence of major repairs is determined on the basis of the duration of operation of engineering systems and structural elements of MKD and an assessment of their technical condition.

At the same time, the owners of premises in MKD, who form a capital repair fund on a special account, can decide to carry out capital repairs ahead of the deadlines established by the regional program. According to Article 189 of the Housing Code of the Russian Federation, the overhaul is carried out on the basis of the decision of the general meeting of homeowners in this house. The decision to carry out major repairs in the MKD is made at the suggestion of the person who manages this house, the regional operator, or on his own initiative. The right to carry out repairs in more early dates defined by part 4.1 of article 170 of the RF LC.

How to correctly draw up a decision on early overhaul?

For the successful implementation of such a decision, it is necessary to comply with the condition that, as of the date of this decision, the funds in the special account are sufficient to finance capital repairs or other methods of financing it have been chosen. At the same time, part 7 of Article 189 of the Housing Code determines that if the overhaul of the common property in the apartment building, the owners of the premises in which form the fund for overhaul on a special account, is not carried out within the time period stipulated by the regional overhaul program, the local government takes decision on the formation of a capital repair fund on the account of a regional operator.

It should be noted that the accumulation of funds for major repairs on a special account excludes the possibility of borrowing the money collected from this account for the needs of other MFBs. It also excludes the possibility of replenishing this account from other accounts for the needs of this house. Accordingly, the owners will need to make a decision to raise the missing funds by applying for a preferential loan or other earmarked funds.

In the decision of the general meeting of owners of premises in an apartment building to carry out early overhaul in an apartment building, the following must be determined and approved:

  • list of overhaul works;
  • cost estimate for capital repairs;
  • the timing of the overhaul;
  • a person who, on behalf of the owners of premises in an apartment building, is authorized to participate in the acceptance of the work performed (Article 189 of the Housing Code of the Russian Federation).

Financing and control of early capital repairs

If the capital repair fund is formed on a special MFB account, then the owners, when carrying out major repairs of common property, can rely solely on the funds accumulated or collected by them, or they can use the monetary funds of credit institutions.

Organization of capital repairs on credit allows owners to carry out selective or complete overhauls in an apartment building, without waiting for the deadlines determined by the regional program. Capital repairs on credit is the most financially balanced scheme for organizing capital repairs, requiring minimal budgetary expenditures. In the accumulative system of financing capital repairs, there is a problem of inconsistency between the cost of major repairs and the size of the payment for major repairs. There is no such problem in the capital repair lending model - the payment exactly finances the costs incurred.

The Russian government plans to launch a loan program for capital repairs of apartment buildings at a preferential rate of 12% per annum, the Deputy Minister of Construction and Housing and Utilities of the Russian Federation Andrei Chibis promised not so long ago. The scope of the program is currently being finalized.

As for the choice of the contractor who can perform work within the framework of the overhaul of the common property in the apartment building, it should be noted that it directly depends on the method of forming the capital repair fund chosen by the owners of the premises in the apartment building.

In the case of choosing the method of forming a capital repair fund on the account of a regional operator, in accordance with clause 3 of part 1 of article 180 of the RF LC, the capital repair fund performs the functions of a technical customer for overhaul of common property. He is obliged to involve contractors for the provision of services and (or) to perform overhaul works, to conclude appropriate contracts with them on his own behalf (part 2 of article 182 of the RF LC). At the same time, the choice of contractors for the provision of services and (or) the performance of work on the overhaul of common property in the apartment building in accordance with part 5 of article 182 of the RF LC is carried out in the manner established by the Government of the Russian Federation.

If cash for overhaul are collected on a special account, then the whole process from start to finish will be controlled by the owners of the apartments located in this house. At the same time, you may have to learn to understand the repair technology, learn as much as possible about the criteria for assessing the quality of work, expand your knowledge in the field of building materials. But as a result, you can get exactly the overhaul that is needed for a particular house.



 
Articles on topic:
ItemPhysic Full Mod - realistic physics in Minecraft
Mod Realistic Item Drops - will make the dropped drop (item) more realistic, now it will not spin in the air, but will lie on the ground like a normal thrown object, in order to pick it up you will need to click on it.
How to drink
Violation of the menstrual cycle is a common problem in gynecology. With a delay of just a couple of days, you should not resort to radical methods, because a number of factors can provoke it: from stress at work to a common cold. But if the absence of menstruation
Qualities for Success
What qualities are needed to achieve success. Certain human qualities are required to be successful. Professional psychologist Nikolai Kozlov talks about ten qualities of a successful person. 1. The body is healthy and energetic. 2. Joyful
Creator and ruler of the golden horde
The Golden Horde (Ulus Jochi, Turkic Ulu Ulus - "Great State") is a medieval state in Eurasia. Encyclopedic YouTube 1 / 5✪ What is the Golden Horde? ✪ Golden Horde. Video tutorial on the history of Russia Grade 6 ✪ Mongol invasion and Gold